Manual

BAND-IT-IDEX, Inc.
A Unit of IDEX Corporation
4799 Dahlia Street
Denver, CO 80216-3070 USA
P: 1-800-525-0758
F: 1-800-624-3925
Document # P07387 rev. D
© Copyright
BAND-IT-IDEX, Inc. 2006
All rights reserved
www.BAND-IT-IDEX.com
Page 1 of 1
D50089/99 D50489/99
Bolted Band Retainer
Installation
Instructions
2. Band must be adjusted to fit pole. Measure distance from
edge of fixed retainer and mark the band. Additional length
must be allowed for any equipment placed under band.
Calculate additional length required and mark band. Cut
the band at least 4-6 inches beyond this mark
3. Slotted equipment must be threaded on the band at this
stage. Remove nut and sliding retainer from carriage bolt.
Thread equipment on band and thread the sliding retainer
on band with the beveled end of the retainer facing the
open end of band.
4. Bend the band at the second mark so that the 4-6 inches of
excess will be inside the band after installation. (See step
5.) Strike the bend in the band to create a sharp radius,
allowing the retainer to lock in place.
6. Place assembly around pole at mounting height. At this
stage, any equipment that does not require threading
should be hung on band.
8. Completed installation.
1. Mark the band at least 4-6 inches from the end and fold the
band at the mark. Strike the band at the bend to create a
sharp radius to allow fixed retainer to lock into place. Slide
band into fixed retainer so that band will fold under retainer
when installed (see #5)
7. Insert the carriage bolt into the sliding retainer. Make sure
the carriage bolt locks into place on the fixed retainer.
Install a washer (not provided) if required. Install the nut
and tighten until equipment is secure and all slack has
been removed from band.
5. Make a 90 degree bend at the base of each retainer. This
will allow retainers and carriage bolt to properly align.
Fixed
Retainer
Sliding
Retainer
Carriage
Bolt
Nut
Bolt must be
flush with
retainer surface
Beveled
End
Thread on
Sharp
Radius

Summary of content (1 pages)