Instruction Manual
Document # I17793 Rev D
© Copyright
BAND-IT-IDEX, Inc. 2009
All rights reserved
www.BAND-IT-IDEX.com
BAND-IT-IDEX, Inc.
A Unit of IDEX Corporation
4799 Dahlia Street Denver, CO 80216-0307 USA
P: 1-800-525-0758 F: 1-800-624-3925
21 of 28
IT3000-AB
1/4” Ultra-Lok Tool
Preventative Maintenance Schedule
Clamps
Installed
Maintenance
Item
Maintenance
Action
Every 12,500 Tension Block Assembly Clean & Re-Lubricate
Flip Cover Clean & Re-Lubricate
Every 25,000 Mechanical Linkage Clean & Re-Lubricate
Tool Head Clean & Re-Lubricate
Cut-off Blade Replace
Cut-off Knife Replace
Front Gripper Clean & Re-Lubricate
Every 50,000 Blade, Blade pin, Knife
and Knife pin
Replace
Tension Block Assembly Replace Assembly
Front Gripper Replace Gripper
Tool Preventative Maintenance:
The tool has some wear components that must be checked and replaced on a certain
schedule. BAND-IT has developed a Preventative Maintenance (PM) schedule to help
facilitate these requirements. If tools are experiencing difficulties during function or there
audible air leaks coming from inside the handle, the tool should be returned to BAND-IT-
IDEX, Inc. for servicing.
BAND-IT recommends that the tool be sent in for general overhaul every 100,000 clamps
installed.
Maintenance