Operating instructions
P44987 Revision “B“ Page 4 of 10
Inspect buckle on completed clamp and tap down buckle shroud.
Applying clamps on soft, thick-walled hose: tension clamp as described on page 3.
Wait 10-15 seconds before lifting handle and forming lock. This allows hose to settle
under clamp (cold flow), after that, clamp may be tensioned more by squeezing
actuator switch on drill until red indicator light glows. Complete clamp as described on
page 3.
Important: Visually inspect lock formed in
band as shown. If lock has slipped under
the sheared surface of the buckle, remove
clamp and install a new one at reduced
tension.
UL9010 Electric Ultra-Lok Tool
Operating Instructions
FRONT VIEW
Completed Clamp
(Visually inspect lock)
Buckle Shroud
Lock sheared in center and
formed inside shroud
SIDE VIEW
Completed Clamp
Tap down buckle
shroud to complete
clamp
Shear Surface