User Manual

Main Tasks to CompleteStep 5
6. Click the Back button.
7. Cleck the Next button to exit the Test Tool configuration.
Main Tasks to CompleteStep 6
In the PresencePLUS GUI, click the Go To Run button. When prompted to save
the inspection:
Save and Start Inspection
1. Enter a name in the Inspection Name field.
2. Click on the Save button.
3. Once the inspection is saved, click the Start button to start the inspection.
P/N 000000Banner Engineering Corp. - Minneapolis, MN USA - www.bannerengineering.com
Tel: 763.544.3164
74
7/2009System Setup Window Overview