Installation Guide

Lavatory Consoles
INSTALLATION INSTRUCTIONS
P 847•244•1234 www.barclayproducts.com
5/24/11
Tools Needed
Screwdriver Drill & Bits 2 Lag Screws, or Large Molly Bolts (NOT Included)
Tape Measure Level One Tube White or Clear Silicone Wrench Pencil
NOTE:
DO NOT tighten too much or you may damage console.
1. Place the large console top upside down on a piece of packing cardboard, to prevent scratching.
2. Place a bead of silicone around the top of each leg.
3. Place each leg into the sockets in the front of the console top. Make sure the legs are firmly set into
each socket. It is best to let the silicone dry for 24 hours to let the legs “set”.
4. After 24 hours, stand the console assembly up and support it against the wall.
5. One person should hold the console top in place. The other person should use a level on the back and
side edges to help position the top, both side to side, and front to back correctly.
6. Use the pencil to mark the mounting hole positions on the wall.
7. Remove the console top and set aside. Drill the holes
through the 2”x12” re-inforced wall.
8. Install lag screws, molly bolts or other mounting hardware in the wall as appropriate.
9. Place the console top with legs against the wall and install using the hardware selected, then tighten.
10. One person should slightly lift up the front of the console and legs. The second person should apply
a small amount of silicone to the bottom of each leg to prevent the legs from moving after installation.
11. Completely tighten the 2 connections of the console to the wall, being careful not to over tighten.
2 people are needed to install the console.
The console top weighs approximately 70 pounds.
Mounting hardware must be adequate for the type of
wall. Be sure to re-inforce wall before installation. We
recommend a 2”x12” securely fastened to wall studs
at the required height for your installation.

Summary of content (1 pages)