Installation Guide

3
1.
2.
Upright
180º
Determine
location and gate
opening before
installing fence.
Fig. 1
Determine Gate Opening:
Gate opening is determined by width of gate plus
clearance for hinge (
7
8") plus clearance for latch/
drop rod (Fig. 1) (see latch instructions for details).
Fig. 2
Installing the Hinge:
Install the hinge on the rail/gate upright (Fig. 2).
The gate can be adjusted to swing 180 degrees
with either a manual or self-closing feature (Fig. 3).
NOTE:
Pilot holes should not be drilled all the way
through gate upright or rails. Mark a pilot hole
using the hinge and drill with
1
8" bit. Also drill
pilot holes on short side of hinge.
Mount Hinges on Gate:
Mount both hinges to the gate using (6) #2 square/
phillips combo screws per hinge (4 on front of
hinge and 2 on side) (Fig. 4).
NOTE:
To ensure performance on any gate,
additional ller may be required.
Cut two 2" spacer blocks to help support the
gate prior to installing hinges to post.
Fig. 4
3.