Instructions / Assembly

3
2a.
For Full Privacy With Two Rails:
a. Apply provided vinyl cement to all inside surfaces
of the uprights where the rails will be installed
(Fig. 1).
b. Install top and bottom rail in the orientation
shown (Fig. 2).
c. Install inll boards. The ends of the inll will t
inside the channel of the upright (Fig. 3).
d. Add vinyl cement to second upright and install as
shown (Fig. 4).
1.
Lay gate components on a smooth, at and clean
surface. Begin by arranging the rails in the
correct orientations.
Fig. 1
Fig. 2
Fig. 3
Fig. 4
Top Rail
Bottom Rail