Operation Manual

EN
page 39
6. MACHINE INSTALLATION
6.1 Handling
6.1.1 Handling the product
The machines must be handled strictly as shown in pict. 5 regarding the grip points indicated
for lifting with a lift truck.
Latchthemachineinawaythatsecuresnovibrationorshocksduringtransportation.
N.B.:Slingingwithropesnotrecommended.
Afterunpacking,makesuretheappliancehasnotbeendamagedduetotransportation.Ifit
hasbeen,donotifytheselleraboutthisproblem.Ifthedamagemightquestionthemachine’s
safety,donotinstalltheappliance.Seechapter8fordisposalofthepackingmaterial.
6.1.2 Storage
Storagetemperature:min.+4°C-max+50°C-humidity<90%.
The stored parts should be checked periodically, to detect any sign of deterioration.
Do not put anything on the machine, even if packed in its box.
6.2 Prepare for installation
This is just a guide-line for the machine installation.
Theinstallationmustbeperformedbyaqualiedengineer.
6.2.1 Room features
Installthemachine,inaroomclosedtoweatherandwithaguaranteedtemperature-range
between 5 and 35°C.
The machine is equipped with thermostatic sensors to manage the temperatures. To
guarantee a proper functionality these sensor shall not operate at a room temperature
below 5°C.
Forthisreason,itisfundamentalthatbeforestartingthemachinereachestheroomtem-
perature.
6.2.2 Electrical connection - Characteristics
The electrical connection to network shall be carried out in accordance to the local laws in
force.
Makesurethatthesupplyvoltageisthesameasreportedonthemachineplateandthat
the network can stand the needed power absorption shown on the same plate.
Makesurethatthefacilityisequippedwithefcientgroundconnection.
pict. 5