FRAMELESS SLIDING DOOR FOR TUB OR SHOWER INSTALLATION INSTRUCTIONS 3/16” Glass QCI5019 Rev 1 Page 1 Certified 02/21/2017
Two primary materials are used to manufacture your new enclosure: tempered glass and anodized aluminum. To assure a long lasting finish on the enclosure, wipe it down with a towel after each use. Never use a scouring agent to clean the aluminum. Lysol To install your bath enclosure, you will need the following: Although safety tempered glass is very resistant to breakage, the glass can still break if unequal pressure is placed on it during installation. Use caution.
S. 1 Nylon Bottom Guide T. 2 #6 x 3/8” Pan Head Screws U. 4 Stainless Steel Bumper Inserts J.
3/16” 3/16” ) QCI5019 Rev 1 Page 4 Certified 12/13/06 Certified 02/21/2017
QCI5019 Rev 1 Page 5 Certified 02/21/2017
QCI5019 Rev 1 Page 6 Certified 02/21/2017
QCI5019 Rev 1 Page 7 Certified 02/21/2017
14 With each panel slightly open, slide the anti-jump clip onto the hanger bracket as shown. Gently push the opening of the anti -jump onto the screw head and roller body until it clicks into place. Anti-jump clips are installed after the panels are hung in place in the header. Installing the anti -jump clips onto the panels before hanging on the header can damage the rollers, panels, header, or failure to allow the roller to align onto the track. These damages are not covered by warranty.