Installation Guide

•••••••••••
••••••••••••
••••••••
•••••••
••
••
•••••••••
••••••••
•••••••••••
•••••••••••••
•••••••••••
•••••••••••••
•••••••••••••••
•••••••••••••••••••••••••••••••
•••••••••••••••••
Locate the nylon bottom guide [S] in the
middle of the tub track [A] with the glass panels in the
position shown. With a 7/64” bit, drill two holes into
the V-groove through the mounting holes in the guide.
Install the bottom guide with two #6 x 3/8” pan head
screws [T] thru the drilled holes as shown.
10
Slide the stainless steel bumper inserts [U] into
the four soft vinyl jamb bumpers [V]. Align the slots in
the bumpers with the glass panels and snap the bumpers
downward over the top and bottom wall jamb screws
[D] with the spacers [E].
11
••••••••
•••••••
•••••••••
••••••••
Neatly caulk each end of the tub track [A]
where it meets the wall jambs [B] and the interior edge
of the wall jambs as shown. Run a bead of caulking
along the interior edge of the tub track.
NOTE: The caulking should be allowed to cure for
twenty-four hours before using your new bath
enclosure.
12
QCI5022 Rev 0 Page 7 Certified 06/21/2016