Installation Guide

Installaon
Cered 09/02/2015
QCI0288 Rev 2
Page 8
BOTTOM HINGE
Find the Boom Hinge (J) and place it on the threshold against the horizontal
U-Channel (M). Make sure that the opening for the hinge matches the U-Channel (M)
as shown below. Mark holes on the threshold then remove the Boom Hinge (J) and
drill 3/16” diameter holes approximately 1-1/2” deep (same as U-Channel (M & A)
holes in steps 1 & 2).
Follow the same steps as securing the U-Channel (M & A) to secure the Boom Hinge
(J) to the threshold.
3
Side View
Ensure hinge is in line with
U-Channel as shown
View from outside shower
QCI5288 Rev. 0 Page 8 of 15 Date Certified: 06/21/2016