Installation Guide
Page 9
Installaon
Cered 4/21/2015
QCI0288
GLASS PANEL
Find the Fixed Panel Glass (D) and Seng Block (1/2”) (N). Place the Seng Block
(1/2”) (N) on the U-Channel (M) then stack addional 1/16” or 1/8” seng blocks if
necessary to make the Fixed Panel Glass (D) plumb with the wall and level with the
oor. Do not place seng blocks over screw heads.
Aer nding the correct combinaon of seng blocks, the Fixed Panel Glass (D) is
ready to be mounted. Take the Clear Vinyl (BB) and place it inside the channel of the
hinge. Use the alcohol pad (or rubbing alcohol) to clean the secon of glass that will
go into the Boom Hinge (J) opening. Loosen the Panel Clamp Screws (CC), mount
the Fixed Panel Glass (D) so it sits inside the U-Channel (M) and Boom Hinge (J),
then ghten the Panel Clamp Screws (CC).
The Fixed Panel Glass (D) will sll be loose and wobble inside the U-Channel (M), this
is ok for now.
4