Installation Sheet

QCI5298 REV. 0 Page 13 Cered 10/1/17
Place two 7/16” shims on the curb or threshold. These shims must remain in place throughout
the installation process. You can stack setting blocks from the Parts Pak if required.
With the help of an assistant inside the shower, lift the Door Glass Assembly into the opening and
set the panel on the shims. Slide the Adjustable Wall Jamb [3] over the Hinge Wall Jamb [2].
Work together to make the door plumb and level, adding or removing shimming from under the door
as required.
16
After the door is leveled, push or pull the door assembly as required to set the gap between
the Glass [1] and the Strike Wall Jamb [4]. Check the top and bottom of the door for the gap.
Set the gap at between 1/4” and 13/16”.
The strike and jambs allows for out of plumb adjustment in the wall as well as some width adjust-
ment. The gap may not be consistent the entire unit height.
CL
7/16” Shim
7/16” Shim
SLIDE ONTO WALL JAMB
17
1/4” to 13/16” GAP
TOP AND BOTTOM
Strike
Wall Jamb
Door Edge
LEVEL