INSTALLATION INSTRUCTIONS Frameless Slider Door QCI5286 FRAMELESS DOOR QCI5286 Rev 0 1 06/20/2016
Parts List With double rollers ITEM NO. DESCRIPTION QTY.
6 2 7 3 5 4 1 8 9 13 12 10 14 11 16 QCI5286 Rev 0 15 3 06/20/2016
Tools: To install your New Shower Enclosure, you may need the following: Drill Hack Saw Pencil Low Tack Tape 1/8” & 3/16” Drill Bit Caulk Gun Tape Measure Center Punch Clear Silicone Caulk 4’ & 6’ Levels Files Suction Cups Safety Notes: This unit is best installed by two people. Handle the glass panels carefully and protect the edges.
1 If a continuous unit centerline does not exist from the original measuring process, it will be necessary to create one. Lightly mark a continuous unit centerline on the threshold. Next, mark a continuous unit centerline on each wall, starting where the threshold centerline meets the wall. Use a level to ensure the wall centerline is plumb and straight. The wall centerlines should be a minimum of the unit height from the threshold.
3 Insert a small amount of silicon into each drilled hole, then insert a wall anchor into each hole. (Note: Drill hole, then insert a wall anchor.) This must be done just before u-channel installation. Carefully cut the heads off the wall anchors with a razor blade. Place the U-Channel in correct position and secure it with #8 x 1-1/2” truss head screws.
5 Insert a wall plug *16+ into each drilled hole. Then carefully cut the heads off of the wall plugs *16+ with a razor blade. So there is nothing raised above the surface of the wall. Place the u-channel *3+ in position and secure it with #8 x 1-1/2” truss head screws *18+. Note: Do not over-tighten the screws. 6 Place 1/8” setting blocks [20] into the U- channel as shown or approximately every 18”.
7 Using suction cups, set the Glass Panel into the Wall S ide U-channels on the appropriate side. Use different sizes of setting blocks to make exposed edges of the glass level and plumb.** Door Side Refer to the sizing chart below to properly orient the Glass Panel according to the unit range. Measurement is from edge of glass to the header bar assembly hole* Exposed edges MUST be level and plumb before moving to next step.
After marking, remove header assembly [8]. Drill a 1/4” diameter hole approximately 1 3/4” deep, at the marked wall location. WALL MOUNT HEADER BRACKET WALL MOUNT HEADER BRACKET INSERT SET SCREWS Next, put the supplied large wall plugs into the hole. Screw the inner part of the Header Bracket into the wall with the supplied socket countersunk head screw. 1. 10 2.
11 The Door guide [11] can now be installed along the threshold. From the edge of the panel glass that was just installed, measure 1 1/2” from the inside of the Horizontal U-channel [4]. Place door guide as shown in picture below, then mark the two holes to drill with a pencil. Insert a small amount of silicon into each drilled hole, then insert a wall anchor into each hole. (Note: Drill hole, then insert a wall anchor.) Carefully cut the heads off the wall anchors with a razor blade.
13 Install the bottom rollers as shown in example 1. Adjust the bottom rollers so that they are centered vertically with the top rollers. (see example 2. Bottom rollers may not make full contact with the header bar). Tighten all fasteners to secure position of rollers.
14 Disassemble the Pull Handle [14] and install on the Door Panel [2] . Handle should face outside of shower and the knob on the back side of the Pull Handle [14] should be on the bottom side as shown.
16 Place large Vinyl Seal [15] on Door Panel [2] so that the vinyl edge sticks out towards the Fixed Glass Panel [1]. Then place smaller 3/8” Vinyl Seal [6] on the handle side of the Door Panel [2] so that the vinyl edge sticks out towards the inside of the shower. (See Example) Use silicone to hold in place. 3/8” Vinyl Seal Large Vinyl Seal 17 The larger vinyl seal will need to be cut slightly in order for the header bar to have space to roll freely. See example below.