Installation Guide

  
11 The Door guide [11] can now be installed along the threshold. From the edge of the panel
glass that was just installed, measure 1 1/2” from the inside of the Horizontal U-channel [4].
Place door guide as shown in picture below, then mark the two holes to drill with a pencil. Insert
a small amount of silicon into each drilled hole, then insert a wall anchor into each hole. (Note:
Drill hole, then insert a wall anchor.) Carefully cut the heads off the wall anchors with a razor
blade. Place the door guide back in correct position and secure it with #8 x 1-1/2” truss head
screws.
12 Disassemble the two Rollers [7] and secure to door panel glass using top two holes.
(See example 1).
With rollers mounted onto the door panel, ensure rollers are rotated to their lowest position so
that the door panel does not hit the ground or u-channel during installation. Then carefully lift the
door panel into place so the rollers rest on top of the roller bar assembly (See example 2). Hold-
ing the door in place, adjust the cammed top rollers so that the top of the door is leveled by turn-
ing cam adjustment holes. Tighten all fasteners to secure position of rollers.
NOTE: The center
piece of the door guide
adjusts the width of
glass it can accept.
Turn the center to
match your door glass
thickness.


Top Roller
Assembly

Header Bar

Cam
adjustment
hole