Installation Guide
QCI0286 8 XX/XX/XXXX
7 Using suction cups, set the Glass Panel into the
U-channels on the appropriate side. Use different
sizes of setting blocks to make exposed edges of
the glass level and plumb.**
Refer to the sizing chart below to properly orient the
Glass Panel according to the unit range. Measure-
ment is from edge of glass to the header bar assem-
bly hole*
Exposed edges MUST be level and plumb
before moving to next step.
8 Once the Stationary Glass Panel [1] has been in-
stalled, unscrew the caps to attach the roller bar header
assembly [8] to the top of the panel glass (see exam-
ple). Once in place, slightly loosen the screw inside to
allow for adjust of the header bar. Once adjusted to
proper length and leveled, tighten the screws.
With the header assembly [8] mounted, use a pencil to mark the location
where it sits flush against the door side wall as shown.
**Different sizes setting blocks may be required depending on level conditions. Various sizes of
setting blocks are provided and can be used in different combinations (stacked) to obtain the
desired result.
*Panel Glass Sizing Chart
Unit Range Wall Side Door Side
44 1/2" - 45 3/4" 5 1/2" 6 7/8"
45 3/4" - 47 1/2" 6 7/8" 5 1/2"
56 1/2" - 57 5/8" 5 1/2" 6 7/8"
57 5/8" - 59 1/2" 6 7/8" 5 1/2"
Door Side
Outside of Shower
Wall Side
Mark Wall