Operation Manual

19
Install your dryer in a room which is not subject
toextreme conditions.
Remove the protective foil from the control panel.
Level the dryer adjusting the four feet.
Take care not to trap the mains cable between the
dryer and the wall.
Stacking kit
Your dryer can be stacked on top of your washing
machine, using the stacking kit AMH 542, which is
available from your dealer.
Building under
Your dryer can be built under, using the built under kit
UBS10 which is available from your dealer.
When building under your dryer, ensure that there
is an external air device to allow the warm air to
vent out.
Minimum housing dimensions:
Width: 600mm
Height: 850mm
Depth: 600mm
The electrical connection has to be carried out
in compliance with local regulations.
Information on the voltage is given on the
rating plate on the back of the dryer.
The earthing of this dryer is compulsory by law.
Do not use extension cords or multiple
adapters.
Before any maintenance on the dryer,
disconnect it from the mains supply.
Do not operate the dryer if it has been damaged
during transport. Contact a qualified service
technician.
In case of replacement of mains cable contact
a qualified service technician.
INSTALLATION
ELECTRICAL CONNECTION