Unit installation

8.6 Prepare appliance fixing holes.
8.6.1 Screwing case to wall.
Recheck the position of the screw fixing holes relative to the flue hole.
Drill the four fixing holes to a minimum depth of 42mm using a suitably sized
masonry drill for the wall plugs supplied.
Insert four plastic wall plugs.
8.6.2 Using cable retention.
Thread the two tension cables through the
appliance case side holes as shown in figure 15.
Move the appliance towards the recess and mark
on the recess back wall the position for the two
eyebolt holes.
Remove the appliance and drill at the marked
positions using a suitably sized masonry drill for the
fibre plugs supplied.
Insert the two fibre wall plugs supplied.
Fit the two eyebolts.
9. FLUE TERMINAL INSTALLATION
9.1 Cutting flue to size.
For outset appliances with surround or spacer
Measure the total wall thickness from the outside surface of the wall to the inside face
of the surround or spacer. Deduct 35mm from this measurement to obtain the correct
length of flue unit required (See figures 16 & 17).
For appliances inset in a recess
Measure the total finished wall thickness including plaster etc. Deduct 35mm from this
measurement to obtain the correct length of flue unit required (See figure 16).
Mark off the flue length on the outer (air) tube measuring from the end of the
terminal.
Insert the polystyrene ring between the inner and outer tubes to support them. Cut
both tubes squarely at the marked distance.
Important: Remove all polystyrene from the flue unit after cutting.
Page 25
© Baxi Heating U.K. Limited 2009.
Figure 15. Cable retention
INSTALLER GUIDE