Unit installation

3. Hold pebble ‘B’ upright with
the arrow pointing to the top.
Locate pebble ‘B’ as shown in
figure 28.
4. Hold pebble ‘C’ upright
with the arrow pointing to the
top. Locate pebble ‘C’ as
shown in figure 29.
5. Hold pebble ‘D’ upright with
the arrow pointing to the top.
Locate pebble ‘D’ as shown in
figure 30.
6. Hold pebble ‘E’ upright
with the arrow pointing to the
top. Locate pebble ‘E’ as
shown in figure 31.
Page 32
© Baxi Heating U.K. Limited 2009.
INSTALLER GUIDE
Figure 31.
Figure 30.
Figure 29.
Figure 28.