Unit installation

Supplied in the fascia pack are two tubular trim sets. Hang these to the tabs on the
fascia (See figure 41).
The lower section of the fascia is secured with magnets. Locate it as in figure 42.
The bottom of the lower section should sit on the tags as shown.
15.3 Fitting the Dream fascia.
Remove any protective film from the fascia.
Locate the two lugs at the top of the fascia in the slots in the convection box hood.
Swing the bottom of the fascia sides back against the convection box and lower the
fascia so that the lugs are fully seated in the slots in the convection box hood (See
figure 34).
Fit the two screws to secure the bottom of the fascia sides to the convection box
side brackets.
Locate the fire front casting between the fascia sides.
Fit the "ash pan" cover below the front casting.
Page 37
© Baxi Heating U.K. Limited 2009.
Figure 42. Fitting the lower section to
the ‘Chic’ fascia.
Figure 41. Fitting the ‘Chic’ hanging trims
INSTALLER GUIDE