Unit installation

Section Heading Page
9. FLUE TERMINAL INSTALLATION 25
9.1 Cutting flue to size. 25
9.2 Fitting to wall. 27
9.3 Fitting the terminal guard. 28
10. GAS CONNECTION 28
11. CERAMIC COALS INSTALLATION 29
12. CERAMIC PEBBLES INSTALLATION 31
13. WINDOW FITTING 33
14. FULL OPERATING CHECKS 33
14.1 Check for leaks. 33
14.2 Check control operation. 33
14.3 Checking inlet pressure. 34
15. FASCIA FITTING 35
15.1 Fitting the Decadent fascia 35
15.2 Fitting the Chic fascia. 36
15.3 Fitting the Dream fascia. 37
16. FINAL REVIEW 38
17. SERVICING & PARTS REPLACEMENT 39
17.1 To remove the fascia. 39
17.2 To remove or clean the window unit. 41
17.3 To remove the ceramic fuel effect and rear wall. 42
17.4 To replace the ceramic fuel effect. 42
17.5 To remove the complete burner module. 42
17.6 To remove the burner from the burner module. 43
17.7 To remove the injector. 43
17.8 To remove the pilot unit. 43
17.9 To remove the gas valve. 44
17.10 To remove the switch and wiring loom. 44
Page 6
© Baxi Heating U.K. Limited 2009.
INSTALLER GUIDE
CONTENTS (Continued)