Technical data

8.0 Installation – page 18
Fig. 15
Fig. 16
8.3 Preparing The Boiler
1. Remove the outer carton.
2. Hinge down the lower door panel to the
horizontal and gently pull forward to remove
(Fig. 15).
3. Remove the outer case fixing screws (Fig. 15).
Slide the outercase upwards to disengage the
hooks on the backplate and remove (Fig. 16).
4. Remove the sealing plugs from the copper
bends (Fig. 16).
5. Stand the boiler on its base by using the rear
lower edge as a pivot.
NOTE: A small amount of water may drain from
the boiler in the upright position.
Baxi Limited declare that no substances
harmful to health are contained in the
appliance or used during construction of the
appliance.