Technical data
12
924.674.3 - GBINSTRUCTIONS PERTAINING TO THE INSTALLER
0503_2201/CG1643
16.5 SEPARATED HORIZONTAL FLUE TERMINALS INSTALLATION OPTIONS
IMPORTANT: Ensure a minimum downward slope of 1 cm toward the outside per each metre of duct length.
In the event of installation of the condensate collection kit, the angle of the drain duct must be directed towards the boiler.
NB: For C52 types, terminals for combustion air suction and combustion product extraction must never be tted on op-
posite walls of the building.
The maximum length of the suction duct for type C52 must be 10 metres.
If the ue duct exceeds 6 m, the condensate collection kit (supplied as an accessory) must be tted close to the
boiler.
16.4 SPLIT FLUE OVERALL DIMENSIONS
0504_1806/CG_1794
0503_0911/CG1644
L max = 15 m 240 Fi
L max = 12 m 280 Fi
L max = 14 m 240 Fi
L max = 10 m 280 Fi
16.6 SEPARATED VERTICAL FLUE TERMINALS INSTALLATION OPTIONS
(L1 + L2) max = 40 m 240 Fi
(L1 + L2) max = 25 m 280 Fi
L max = 10 m 240 Fi
L max = 8 m 280 Fi