Instructions

bdiusa.com
customerservice@bdiusa.com
MÜV 1252
Table
2
Step 2 - Place the top panel C1 (which has a finger groove around the bottom edge as shown). Remove the
protective film from glass panel A1. Slide one edge of glass panel A1 (with aluminum rail) into the matching
slot on bottom side of top panel C1. If the aluminum channel is tight, brace the front edge of the top panel.
Step 3 - Take the middle panel C2 and position it as shown until the connectors engage with each other.
Make sure the edges are flush.
C1 Top Panel
A1 Glass Panel
Finger Groove
Wall