Specifications

1 - 7 Installing your Beachcomber Hot Tub
Installation Instructions for:
700 SERIES 2 SPEED PUMP SYSTEM
1. Carefully unpack equipment and
place equipment in front of protec
interface plate on hot tub.
2. Secure green ground wires to the
ground terminal on the the
Management System.
3. Plug hot tub light cord into light
receptacle on the Management
System.
4. Plug ozone generator (optional) cord
into ozone receptacle on the
Management System.
5. Plug pump1 cord into pump1
receptacle on the Management
System.
6. Plug pump2 cord into pump2
receptacle on the Management
System.
7. Plug blower (optional) cord into
blower receptacle on the
Management System.
8. Secure both plumbing kits 1
(suctions) unions to pump1 and
pump2’s inlet ports, ensure gaskets
are in place.
9. Secure plumbing kit 5 (pump return)
unions to 2 speed outlet port and the
Management System inlet port,
ensuing gaskets are in place.
10. Secure plumbing kit 6 (heater return)
to the Management System, ensure
gasket is in place.
11. Secure plumbing kit 8 (blower fitting)
to blower, ensuring gasket is in
place.
12. Secure plumbing kit 2 (1 speed
pump return) to pump 2, ensuring
gasket is in place.
13. Carefully slide equipment forward to
meet unions on interface plate,
ensure all gaskets are in place, then
secure.
14. Run control panel wire from interface
plate underneath the Management
System, then in thru the access hole
in bottom of the Management
System, and then plug into
receptacles on the right side of the
circuit board.
15. Slide thermistor probe into
compression fitting on interface
plate. Insert up to the marker on the
wire to make sure it is in all the way.
Note: if probe is not installed
correctly, the temperature read-out
will not be accurate.
1
5
6
8
2
1