Specifications
Installing your Beachcomber Hot Tub 1 - 8
Installation Instructions for:
500 SERIES HUSH PUMP
TM
SYSTEM
1. Carefully unpack equipment and
place equipment in front of protec
interface plate on hot tub.
2. Secure green ground wires to the
ground terminal on the Management
System.
3. Plug hot tub light cord into light
receptacle on the Management
System.
4. Plug ozone generator (optional) cord
into ozone receptacle on the
Management System.
5. Plug pump1 cord into pump1
receptacle on the Management
System.
6. Plug Hush Pump
TM
cord in Hush
Pump
TM
receptacle on the
Management System.
7. Secure plumbing kit 1 (suction)
union to 1 speed pump inlet port,
ensuring gaskets are in place.
8. Secure plumbing kit 2 (pump return)
union to 1 speed pump outlet port,
ensuring gasket is in place.
9. Secure plumbing kit 3 (hush suction)
union to Hush Pump
TM
.
10. Secure plumbing kit 4 (hush pump
return) unions to Hush Pump
TM
outlet
port and the Management System
inlet port, ensuing gaskets are in
place.
11. Secure plumbing kit 7 (heater return)
to the Management System, ensure
gasket is in place.
12. Carefully slide equipment forward to
meet unions on interface plate,
ensure all gaskets are in place, then
secure unions.
13. Run control panel wire from interface
plate underneath the Management
System, then in thru the access hole
in bottom of the Management
System, and then plug into panel
receptacle on circuit board.
14. Slide thermistor probe into
compression fitting on interface
plate. Insert up to the marker on the
wire to make sure it is in all the way.
Note: if probe is not installed
correctly, the temperature read-out
will not be accurate.
2
1
4
3
7