Specifications
1 - 9 Installing your Beachcomber Hot Tub
Installation Instructions for:
300/500 SERIES 2 SPEED PUMP SYSTEM
1. Carefully unpack equipment and
place equipment in front of protec
interface plate on hot tub.
2. Secure green ground wires to the
ground terminal on the Management
System.
3. Plug hot tub light cord into light
receptacle on the Management
System.
4. Plug ozone generator (optional) cord
into ozone receptacle on the
Management System.
5. Plug 2 speed pump cord into pump1
receptacle on the Management
System.
6. Secure plumbing kit 1 (500 Series)
or 9 (300 Series) (suction) unions to
2 speed pump inlet ports, ensure
gaskets are in place.
7. Secure plumbing kit 5 (pump return)
unions to 2 speed outlet port and the
Management System inlet port,
ensuing gaskets are in place.
8. Secure plumbing kit 6 (heater return)
union, ensure gasket is in place.
9. Carefully slide equipment forward to
meet unions on interface plate,
ensure all gaskets are in place, then
secure.
10. Run control panel wire from interface
plate underneath the Management
System, then in thru the access hole
in bottom of the Management
System, and then plug into
receptacles on the right side of the
circuit board.
11. Slide thermistor probe into
compression fitting on interface
plate. Insert up to the marker on the
wire to make sure it is in all the way.
Note: if probe is not installed
correctly, the temperature read-out
will not be accurate.
1 - 500 Series
6
5
9 - 300 Series