Warranty

Page | 14
Figure F1: Attaching the (k1) Left Projection Bar and (k2) Right Projection Bar to the (j1) Left Back Bar
and (j2) Right Back Bar
Figure F2: Attaching the Projection Bars to Front Bar
Step 8: Installing Middle Support to the Front Bar
Parts you will need for a 5ft: 1-(q) Middle Support, 4-(f) Sheet Screws, Drill
Parts you will need for a 6ft: 1-(q) Middle Support, 4-(f) Sheet Screws, Drill
Parts you will need for a 7ft: 1-(q) Middle Support, 4-(f) Sheet Screws, Drill
Parts you will need for an8ft: 1-(q) Middle Support, 4-(f) Sheet Screws, Drill
a) Take the adjustable end of the (q) middle support and align the holes with the holes in the
middle of the back side of the assembled (c1) and (c2) front bar.
b) Apply 4 (f) sheet screws to the holes
Step 9: Installing the Shroud (Hood Cover) to the Surface
Parts you will need for a 5ft: 1 -(n1) Left Shroud (Hood Cover), 1 -(n2) Right Shroud (Hood
Cover), 4-(o) M8 or M6 Anchors, 4-(m) Nuts, Drill, Level, Measuring Tape
Parts you will need for a 6ft: 1 -(n1) Left Shroud (Hood Cover), 1 -(n2) Right Shroud (Hood
Cover), 4-(o) M8 or M6 Anchors, 4-(m) Nuts, Drill, Level, Measuring Tape