Warranty

Page | 15
Parts you will need for a 7ft: 1 -(n1) Left Shroud (Hood Cover), 1 -(n2) Right Shroud (Hood
Cover), 4-(o) M8 or M6 Anchors, 4-(m) Nuts, Drill, Level, Measuring Tape
Parts you will need for an8ft: 1 -(n1) Left Shroud (Hood Cover), 1 -(n2) Right Shroud (Hood
Cover), 4-(o) M8 or M6 Anchors, 4-(m) Nuts, Drill, Level, Measuring Tape
a) Carefully measure the distance between each mounting opening on the (n) Shroud (Hood Cover)
with measuring tape. The (n1) Left Shroud (Hood Cover) should have an extension added to it.
Make sure when you are installing the (n1) and (n2) shrouds, that the one shroud with the
extension overlaps the other shroud.
b) Still using the measuring tape, mark the same measurements of the mounting holes you
gathered from the combined (n1) and (n2) Shroud (Hood Cover) onto on the desired mounting
surface with chalk. Use a level as needed.
c) Drill pilot holes onto the specific markers. Refer to figure G1.
d) Line up the mounting holes with the holes on the (n1) and (n2) Shroud (Hood Cover). Put the (o)
anchors through each hole of the (n1) and (n2) Shroud (Hood Cover) and into the wall and make
sure they are snug.
Figure G1: Drill Pilot Holes into the Mounting Surface
Figure G2: Installing (n1) and (n2) Shroud (Hood Cover) to the Pilot Holes