User's Manual

Product Overview
Mounting Kit Installation – Using LP2S Kit
10
BEC 6900 R21 / RidgeWave 6900 User Manual
2. Pole Mounting for Pole 1” ~ 3” (25.4 ~ 76.2mm)
The BEC 4G/LTE ODU must be directed towards the nearest base station.
Fix the
stainless
-
steel
b
racket to the pole by
using the supplied stainless hose clamps (1” ~
3”). Use a flat-head screwdriver to turn the head
of the screw clockwise to tighten it.
Use
1
~
3
” hose clamp
s
through
the stainless-steel bracket.
Co
mpleted