User's Manual

Product Overview
Mounting Kit Installation – Using RT4R Kit
18
BEC 6900 R21 / RidgeWave 6900 User Manual
4. Proper Grounding to Complete the Installation
Attach the grounding wire to the BEC 4G/LTE ODU and tighten the screw.
5. Position Adjustment
Adjust the BEC 4G/LTE ODU until it reaches the desire elevation and depression angle,
then tight the M8 nut (see Attach the BEC 4G/LTE ODU Enclosure to the Pole for more
information)
320
436.8
33
°
320
33°
Max. upward angle: 33°
Max. downward angle: 33
°
Completed
Max. upward angle: 40°
Max. downward angle: 40°
40°
40°