Instructions / Assembly

PACKAGE CONTENTS
PREPARATION
Before beginning operation of product, make sure all parts are present. Compare parts with package contents list and diagram above.
If any part is missing or damaged, do not attempt to assemble, install or operate the product. Contact customer service for
replacement parts.
Estimated Assembly Time: 15 minutes
No tools required for assembly.
OPERATION INSTRUCTIONS
Part Description Quantity
A LV130T Pump 1
B Mesh Bag 1
C LED Frog 1
Tubing
Flow
control
GFCI
LED FROG POND ART KIT INSTRUCTIONS
MODEL: FG529LK
C92117
Rev. A
STEP
1
:
Connect tubing and LED light cord to the
PUMP
with the appropriate as shown.
STEP 2: Place the PUMP in the MESH BAG, and then put them into the water. For proper operation, the
PUMP requires a minimum of 2” of water.
STEP 3: Plug the PUMP electrical cord into a properly grounded
(grounding-type) receptacle.
STEP 4: If you desire to adjust the flow rate, unplug the PUMP
electrical cord from the receptacle and adjust the PUMP’S flow
control. Repeat above steps until you achieve the desired flow.
READ AND FOLLOW ALL SAFETY INSTRUCTIONS!
SAVE THIS MANUAL FOR FUTURE REFERENCE.

Summary of content (6 pages)