TDS

TECHNICAL DATA SHEET
This information is provided "as is" and no representations or warranties, either expressed or implied, of merchantability, tness for a particular purpose or of any other
nature are made with respect to this information or to any product referred to in this information. For SDS or to consult with a Behr Certied Coatings Professional,
call 1-800-854-0133 Ext. 2 (U.S.A. only). ©2019 Behr Process Corporation, Santa Ana, CA 92705 U.S.A.
Revised 6/2019
1 of 2
SCUFF DEFENSE
INTERIOR EXTRA DURABLE FLAT PAINT
NO. 1720 ULTRA PURE WHITE®
PRODUCT INFORMATION
BEHR ULTRA™ SCUFF DEFENSE™ Interior Extra Durable Flat Paint sets a new standard for at paint durability. SCUFF DEFENSE
is a Stain-Blocking Paint & Primer in One featuring breakthrough innovation to deliver a rich at nish that is truly durable
enough for high-trac areas.
RECOMMENDED USES:
Use on properly prepared, coated and uncoated, interior surfaces such as:
• Drywall/Gypsum Board • Plaster • Concrete • Masonry • Brick
• Concrete Masonry Units • Wood • Engineered Wood • Steel • Galvanized Steel
• Aluminum • Other Ferrous Metals • Other Non-Ferrous Metals • Architectural Plastics
PRODUCT SPECIFICATIONS:
Tint Bases/Max Tint Load:
No. 1720 Ultra Pure White 128  oz / 2  oz
No. 1724 Medium Base 120  oz / 10  oz
No. 1723 Deep Base 116  oz / 14  oz
Gloss: 0-4 @ 6
Sheen: 0-4 @ 85°
Resin Type: 100% Acrylic
Weight per Gallon: 11.5 lb
% Solids by Volume: 44% ± 2%
% Solids by Weight: 58% ± 2%
VOC: <50 g/L
Flash Point: N/A
Viscosity: 90-105 KU
Recommended Film Thickness:
Wet: 6.4 mils / Dry: 2.8 mils @ 250 sq ft/gal
Wet: 4.0 mils / Dry: 1.7 mils @ 400 sq ft/gal
Coverage: 250-400 sq ft/gal depending on application
method and substrate porosity. Does not include the loss of
material from spraying.
APPLICATION:
Brush: Nylon/polyester
Roller: 3/8" - 1/2" nap roller cover, depending on surface
texture
Airless Spray:
Tip: .015”- .019”
Filter: 60 mesh
Fluid Pressure: 1,400 - 2,400 psi
Thinning: Do not thin if using a roller or brush; however,
if using a sprayer and thinning is required, thin with water at
a rate of no more than 1/2 pint per gallon.
Dry Time: @ 77°F & 50% RH
To Touch: 1 hour
To Recoat: 2 hours
Full Cure: 4 weeks
Dry times are temperature, humidity, and lm thickness
dependent.
SURFACE PREPARATION:
All surfaces must be clean, free of dust, chalk, oil, grease,
wax, polish, mold and mildew stains, loose and peeling paint,
rust and all other foreign substances.
New Drywall: All drywall surfaces should be suciently
sanded smooth. Remove any remaining drywall dust prior to
priming. Allow all drywall compounds to be completely dry
prior to coating.
New Wood: Remove mill glaze with sandpaper or use a
product such as BEHR PREMIUM® All-In-One Wood Cleaner
No. 63 to open the pores of the wood and follow all label
instructions. For severe stains caused by mold, mildew, algae
and fungus, apply a mildew stain removing product. Set nails
and ll holes, scratches, and gouges with the appropriate
wood ller and let dry completely. Remove all dust with a
wiping cloth. Fill all gaps with a 100% acrylic, siliconized,
paintable caulking and allow to dry completely. Patched and
lled surfaces should be sanded smooth and dusted clean
prior to coating.
New Masonry: The pH must be 10 or lower prior to
coating. Smooth masonry may require an adequate prole
for adhesion. For all other smooth trowel concrete, create
an adequate prole for adhesion using a product such as
muriatic acid etcher or with mechanical means. Remove all
loose aggregate and debris. Prime the area with an alkali-
resistant primer.
New Plaster: New plaster should be thoroughly dried out
and cured for a minimum of 30 days before painting.
When cured, clean using a mixed solution of one part vinegar
and one part water to remove eorescence and neutralize.
Prime the area with an alkali-resistant primer.
Steel: Minimum surface preparation is Hand Tool Cleaning
in accordance with SSPC-SP2. Remove all oil and grease from
the surface with a solvent in accordance with SSPC-SP1.
For optimal performance, use Commercial Blast Cleaning
in accordance with SSPC-SP6. Prime the area with a rust-
inhibitive primer the same day as cleaned.
Galvanized Steel: Solvent clean new galvanized metal in
accordance with SSPC-SP1 to remove oil and grease from
the surface. Pre-treat with a phosphoric acid solution or
a commercially-available etching solution. Galvanized
metal that has been passivated with chromates or silicates
may require brush blasting in accordance with SSPC-SP16
to remove these treatments. Rusty galvanizing requires a
minimum of Hand Tool Cleaning in accordance with SSPC-SP2.
Prime the area the same day as cleaned.
Shop-Primed Steel: As there is potential for many forms
of contamination during storage and transport, a thorough
cleaning is always recommended for shop-primed surfaces.
Paint exposed areas, i.e., where shop primer is abraded,
with the same material as used for shop priming to comply
with SSPC-PA 1 for touching up shop-primed surfaces. Note:
Assess the integrity of the shop primer prior to application
of subsequent coatings. Review all coatings intended for the
project and conrm the compatibility between shop and
eld-applied coatings.
Aluminum: Remove all oil and grease from the surface with
a solvent in accordance with SSPC-SP1. Prime the area the
same day as cleaned.
Stain-Blocking: After priming, test for stain bleed-through
by applying the topcoat to a small section. If the stain bleeds
through the topcoat, apply a second coat of primer and
test again before topcoating the entire area. If bleeding
continues, primer may need a longer dry time before
applying topcoat.
Previously Painted Surfaces: Remove all loose and
peeling paint and all other foreign substances. Clean any
dirt and grease by scrubbing the surface with a detergent
and water solution, followed by a thorough rinsing with
clean water. Set nails and ll holes, scratches, and gouges
with the appropriate wood ller and let dry completely.
COMPLIES WITH THE BELOW AS OF 6/1/2019
SCAQMD YES OTC YES
CARB SCM 2007 YES LADCO YES
CARB YES AIM YES
OTC PHASE II YES

Summary of content (2 pages)