User Manual
Installation
2Installation
2.1 SpaceRequirements
• Maximum installation plate thickness: 6.5 mm
• Space requirements in millimeters when installing the operator panel:
Note:
Thedimensionson thedrawingarenotproportional.
Caution:
Theopeningsonthe e
nclosureareforairconvection. Donot covertheseopenings.
BeijerElectronics, MAEN181B
6