User Manual
Installation
3Installation
3.1 Space Requirements
• Maximum installation plate thickness for 4.3″ and 7.0″: 1 1 mm, 10.0″:7
mm and other sizes: 8 mm
• The following drawings show the space requirements in millimeters w hen
installing the operator panel. The drawings are only illustrative and may be
out of p roportion.
3.1.1 4” X2
50 mm
100 mm
100 mm
100 mm
104 mm
50 mm
145 mm
43 mm
X2 pro 4 - B2
X2 control 4 - B2
X2 motion 4 - B2
Beijer Electronics, MAEN202
9