Service manual
Belarus 80.1/80.2/82.1/82.2/82Р — Operation and Service Manual
Section 5. Final Assembly and Running-In
41
Figs. 13, 14. Starting pre-
heater:
1 — plugпробка; 2 — water-
delivery pipe (to be installed on
the r-h side of the diesel-
engine); 3 — water jacket; 4 —
water discharge pipe; 5 — oil
casing enclosure; 6, 23 —
brackets; 7 — hot-gas supply
branch-pipe; 8 — glower plug
cable; 9 — glower plug; 10—
boiler ; 11 — air-supply branch-
pipe: 12 — fan flap; 13 — fan;
14 — clamps; 15 — electric
motor; 16 — electric motor
bracket; 17 — drain tap; 18 —
boiler bracket; 19 — electric
motor cable: 20 — fuel supply
pipe to burner; 21 — electro-
magnetic valve cable; 22 —
electromagnetic valve; 24 —
fuel tank; 25 — fuel feed pipe;
26 — shut-off cock; 27 — filler
throat cap; 28 — bundle of ca-
bles; 29 — control panel; 30 —
glower plug switch: 31 — check
glowing spiral; 32 — switch con-
trol knob; 33 — external jacket;
34 — coolant supply manifold;
35 — inner water jacket; 36 —
unburned fuel drain pipe; 37 —
baffle: 38 — combustor; 39 —
swirler; 40 — fan impeller: 41 —
hot water discharge branch-
pipe; 42 — electromagnetic
valve body; 43 — gland nut; 44
— adjusting needle; 45 — valve
saddle; 46 — valve; 47 — mov-
ing core; 48 — stationary core;
49 — coil; 50 — filler throat filter.
Рис.13.
Рис. 14