GB Operators Manual 4 - Spare Parts Book 14 870/00001/0 12/09
EC DECLARATION OF CONFORMITY / DECLARATION CE DE CONFORMITE / DECLARACIÓN DE CONFORMIDAD CE / DECLARAÇÃO CE DE CONFORMIDADE / EG-VERKLARING VAN OVEREENSTEMMING / EF OVERENSSTEMMELSESERKLÆRING GB F We, Belle Group Sheen UK, Sheen, Nr.
EGKONFORMITÄTSERKLÄRUNG / DICHIARAZIONE CE DI CONFORMITÁ / EG-VERKLARING VAN OVEREENSTEMMING / EC SAMSVARSERKLÆRING / EY-YHDENMUKAISUUSILMOITUS / DEKLARACJA ZGODNOSCI Z PRZEPISAMI UE D I S NO SF PL Wir, Belle Group Sheen UK, Sheen, Nr.
GB Introduction Congratulations on your purchase of this quality concrete mixer from the Belle Group Range. This machine is manufactured to conform to the EEC directives currently in force, is issued with a Declaration of Conformity and therefore displays the CE mark, applicable in territories where they are enforced. Retain this manual with your machine for future reference.
GB Technical Data B C A E F D All Models A - Height (Off Stand) B - Width (Off Stand) C - Length (Off Stand) D - Height (On Stand) E - Width (On Stand) F - Length (On Stand) Minimix 150 890 mm 597 mm 1211 mm 1432 mm 1056.5 mm 1227 mm Electric Models Unladen Weight Stand Weight Maximum Drum Capacity Maximum Mixing Capacity Drum speed (RPM) Nominal Voltage Nominal Current Nominal Power Current Frequency Motor R.P.M. Protective System Power Consumption Sound Power Level 110v 50Hz 55.5 Kg 9.
GB Functional Controls Air Intake Vent (This must not be obstructed or blocked) Emergency Stop Button Thermal Trip Reset Button (USA Only) On / Off Buttons Tip Handles Mixing Drum Stand Assembly Clip Pivot Stand Top With 360° rotation Stand Base 12/09 6
Safety Instructions GB Before starting the mixer Ensure engine oil is filled to correct level before operating mixer. Note: The engine must be lifted to the horizontal position when filling and checking oil. Check that all guards are in position and correctly fitted. DO NOT wear loose clothing or jewellery that may become entangled in the workings of this machine.
GB Warning Decals Warning! Caution Taken When Handling. Wear Ear Protection. Fire and Explosive Risk. Wear Eye Protection. Wear Protective Footwear. Read Operators Manual. Do Not Hang. This Way Up. Only Stack 3 High. Honda GX120 Engine Only:- ON OFF Position Of The Engine Emergency Stop Switch. Emergency Stop Switch Operating Instructions. Assembly Instructions GB Ensure drum fits right up to the shoulder on the shaft.
Stand Assembly GB 2 1 3 DO NOT Tip mixer onto drum mouth when the motor is running CAUTION whilst rotating the mixer up into the stand position, always lift from the front of the mixer. NOTE: When ready for dismantling the mixer after use, follow all the previous procedures but in reverse order. Ensure Stand Clip is located correctly onto frame. Loading and Unloading CAUTION GB Never remain under or in the immediate vicinity of the machine when it is lifted by a crane.
GB Service and Maintenance Before starting any maintenance or repairs, switch off motor, and isolate from the main power supply. On completion of maintenance, check that the mixer functions correctly and that all guards are correctly fitted. ELECTRIC MIXER All portable electric appliances are dangerous if abused. This machine will only operate on one voltage. Check the power supply to ensure it corresponds to the voltage as indicated on the rating label.
GB Service and Maintenance Switch Check Flow-Chart FAULT: Motor runs but switch will not latch. QUESTION: Did the machine stop whilst running? NO QUESTION: Has the machine been running and then switched off in the last 60 mins? YES NO ACTION: CHECK THE POWER SUPPLY YES ACTION: Check and test the thermal protection device. METHOD: Hold the ON button down for a minimum of 2 minutes, this will allow the fan on the motor to cool the system. NOTE: A trip out could be caused by low voltage supply.
GB Mixing Hints Mix Ratios The correct mix ratio (cement:sand:stone) depends on the type of application; harder concrete requires more cement, rougher applications require more aggregate. The ratios given below are guidelines: best proportions may depend on the quality of sand/stone used. First put in the water - around 7 litres (1½ gallons), using more or less depending on the type of mix required. Add some aggregate before adding cement, to avoid sticking.
12/09
1-01 2 17 21 15 18 16 13 1 11 12 23 22 5 14 7 20 3 18 23 10 8 19 6 6 4 9 Frame Assembly, Ensemble Châssis, Cjto. Estructura, Montagem do Estrutura 1 2 2 2 2 3 4 4 5 6 7 8 9 10 10 10 11 12 13 13 13 13 14 14 14 14 15 15 15 15 16 17 17 17 17 18 18 19 19 20 21 22 23 24 3 x2 1-01 900/24800 ............. Frame ..........................Châssis....................................... Estructura.................................... Estrutura ..........................................................
2-01 9 1 10 8 2 6 3 4 5 7 3 Handle Assembly, Ensemble Poignée, Conjunto de Manillar, Conjunto do Punho 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 3 4 4 4 4 5 6 7 8 10 10 10 10 2-01 900/99914 .............. Cover - Orange ................ Couvercle - Orange ........... Cubierta - Naranja.............. Tampa - Arancione ................Minimix .......................................1 900/99914G2 ......... Cover - Green .................. Couvercle - Vert................. Cubierta - Verde.................
3-01 1 6 2 3 5 4 11 10 8 13 14 6 7 9 12 14 15 Gearbox Assembly ( 1 2 3 4 5 6 7 8 9 10 11 12 13 14 14 15 15 12/09 Jul ’99 3-01 Oct ’04) MS08................Gearbox Case ................Carter de boîte de vitesses .......Envoltura de la transmisión ....... Caixa de engrenagens ......................................................1 MS09................Drum Shaft .....................Arbre de tambour ......................Eje de tambor ............................ Veio do Tambor ..............
3-02 1 6 2 3 5 4 11 10 8 13 14 6 7 9 12 14 15 Gearbox Assembly ( 1 2 3 4 5 6 7 8 9 10 11 12 13 14 14 15 15 3-02 Oct ’04) 900/37602 ........Gearbox Case ................Carter de boîte de vitesses .......Envoltura de la transmisión ......Caixa de engrenagens .......................................................1 MS09................Drum Shaft .....................Arbre de tambour ......................Eje de tambor ...........................Veio do Tambor ...................................
4-02 16 15 17 20 18 10 19 12 13 4 7 6 11 3 6 8 14 5 6 1 2 9 Motor Assembly ( 1 1 1 2 3 4 5 6 7 8 9 10 10 11 12 13 14 15 15 16 17 18 18 18 19 20 20 20 12/09 4-02 Apr ’02) 900/26800 ........Motor ................................ Moteur............................................ Motor..................................Motor ............................................ 110v, 50Hz ..................1 900/22100 ........Motor ................................ Moteur...........................
4-03 April 2007 20 22 18 27 21 23 28 25 16 15 19 24 17 12 10 13 4 7 11 6 14 3 6 8 5 6 1 2 26 9 Motor Assembly ( 1 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 15 16 16 17 18 18 19 20 21 22 22 23 24 25 25 25 26 27 27 28 4-03 Apr ’02) 900/34400 ........Motor ................................ Moteur............................................ Motor..................................Motor ............................................ 110v, 50Hz ..................1 900/34300 ........Motor .......
Honda GX120 5-01 14 12 15 1 13 11 5 10 6 4 2 5 9 3 7 5 8 5-01 Engine Assembly (Honda GX120) 1 2 3 3 3 3 4 5 6 7 8 9 9 9 9 10 11 12 13 14 15 12/09 20/0038 ............... Engine................................ Moteur .......................................Motor .............................. Motor .................................... Honda GX120 .........................1 900/99927 ........... Belt Guard ......................... Capot de courroie ....................Protector de la correa..
5-02 Honda G100 Honda GXH50 14 14 15 4 15 1 5 9 6 12 3 13 11 7 10 8 13 2 5-02 Engine Assembly (Honda) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 MS15................... Engine................................ Moteur ................................Motor ................................. Motor ........................................ Honda G100 ..........................1 900/99927 ........... Belt Guard ......................... Capot de courroie .............Protector de la correa ........
5-03 Robin EY08 Robin EH09DU 14 14 15 4 15 1 5 9 6 12 3 13 11 7 10 8 13 2 5-03 Engine Assembly (Robin) 1 2 3 4 5 6 7 8 9 10 11 11 11 11 12 12 12 12 13 14 15 MS16 .................... Engine .............................Moteur ...........................................Motor ..................................Motor .......................................Robin EY08 ........................1 900/99927 ............ Belt Guard ......................Capot de courroie .........................
5-04 Briggs & Stratton 3.5hp IC Briggs & Stratton Vanguard 18 18 6 7 11 18 18 12 1 4 15 5 16 8 14 9 3 10 2 17 2 5-04 Engine Assembly (Briggs & Stratton) 1 2 3 4 5 6 7 8 9 10 11 12 13 13 13 13 14 15 16 17 18 9 13 CMS19 ................ Engine............................ Moteur....................................Motor ................................. Motor ........................................ B & S 3.5hp IC .......................1 900/99927 ........... Belt Guard .................
No.1 for Light Construction Equipment Belle Group Head Office Sheen, Nr. Buxton Derbyshire. SK17 OEU GB. Tel: +44 (0)1298 84606 Fax: +44 (0)1298 84722 email: sales@belle-group.co.