• During set-up:  
1.  Place a 1.5  mm² single strand  wire in  a  sheath  along the terrain border. Use thermo 
retractable crimp-on connectors with resin.
 The cable is positioned between 2 and 5 cm 
deep. 
2.  Maximum 1000 metres of peripheral wire.
3.  Avoid the creation of bottlenecks in the area where the machine moves around.
4.  Avoid including an additional area in the work area by a very narrow passage (width of 
passage: min 5 metres).
5.  Do not leave major  irregularities in the  terrain  (hollows  or  bumps).  Spread sand on the 
irregular area.
6.  The edges of the terrain, delimited by trees or hedgerows must be mowed.  
7.  Shrubs do not stop the machine, protect them with a ‘rigid physical’ protection (allow ob-
stacles of a minimum 40 cm  high areas of a maximum 50 cm); remove or protect obsta-
cles of less than 15 cm in height on the terrain
. 
8.  Limit yourself to 5 islands in the working area. 
9.  Do not place a peripheral wire perpendicular to a steep  slope  line  of  more  than 15%, 
(even at the bottom of a slope). Leave a minimum of 1 metre flat. 
10. Terrains that are too marshy, not drained, with an accumulation of water at certain peri-
ods and/or certain locations must be adapted by effective drainage. 
11. Collect the grass before using machine on a terrain for the first time. 
12. Do not place  an obstacle  at less than  2  metres  from the  layout of the  wire  when  it by-
passes an island (to avoid obstacles on the return to the station).  
13. Place the  station  in an area  where there are no  obstacles near the  wire,  leave  the wire 
accesses open  (on 10 metres before and after the  station).  The station must be set up 
in the largest space in the mowing area, and do not set it up in a secluded location or in a 
secondary area.  Insert  the  peripheral wires  and the power supply  wire  underneath the 
station via holes of a size equal to the diameter of the sheaths. 
14. The station must be positioned on a flat surface of min. 2 metres in front of the station 
arm. In addition it must have the straightest line possible for 3 metres on both sides of 
the station (a slight curve without a break is acceptable) BUT a completely straight line 
for 1 metre on both sides of the station is mandatory. 
15.Connect the station in accordance with the current guidelines (terminal protected by differen-
tial for the exterior, buried cable…).
16. Protect water features or areas at risk.
17. Keep 15 metres around the station without obstacle. 
18. Two stations must be at least 30 metres apart (2*15 m).
19. Protect areas at risk (pond, lake, swimming pool, path…) by a physical obstacle.
20.You can coordinate the automatic sprinklers with the station load arm via an optional ac-
cessory (contactor).