Manual

INSTALLATION FOR DOME COVERS MD-100 AND MD-200
For permanent installation use the enclosed adhesive strips.
Clean the surfaces with 50/50 alcohol and water.
Apply strips to the inside of the covers.
Clean surface of the pulley flange using 50/50 alcohol and water, then scour the surfaces using
Scotch Brite until the surface is somewhat porous and then clean the surface again.
Apply covers to pulleys. Do not attempt to work with the adhesive if temperature is less than 68
degrees; doing so may interfere with proper bonding.
Enclosed are 8-32 x 3/16 stainless buttonhead screws, which may be used instead of the
adhesive strips. Use a #29 drill and an 8-32 tap. Be sure to use red Loctite® when installing
screws.
Note: You may remove the dome covers by using a heat gun to soften and/or loosen the adhesive
strips. With a pair of heat resistant gloves twist the outer dome cover to release the adhesive strip and
pull outward on dome cover. Heat, twist and pull outward.

Summary of content (1 pages)