User's Manual
Fault Isolation Procedures
Power-Up Sequence Test
2-12
Power-Up Sequence Test, continued
Step H Procedure Condition Action
1. Key off.
2. Measure resistance between:
• Central Processing
Unit 32-way
connector pin C4
and Antenna
4-way connector
pin 3.
• Central Processing
Unit 32-way
connector and pin C4
and ground.
If resistance between pin C4
and pin 3 is 0 to .3 ohms and
if resistance between pin C4
and ground is more than 10K
ohms or open circuit [OL]
If any of the above conditions
are not met
Go to Step I.
Repair OEM wiring harness between
Antenna and Central Processing Unit.
Go to Step V.
1
CD
2
3
4
5
6
7
8
9
10
11
12
13
14
16
15
1
CD
2
3
4
5
6
7
8
9
10
11
12
13
14
16
15
OHMS
V ACOM
OHMS
GROUND
V ACOM
1
2
3
4










