Product Manual

14
CLEARANCES
XPR-9S
STEP 5
(Installing the POWER SIDE post)
1. Before proceeding, double the check measurements
and make certain that the base plate of each post is
aligned with the chalk line.
2. Using the base plate on the POWER SIDE post as a
guide, drill each anchor hole in the concrete approximately
4” deep using a rotary hammer drill and 3/4” concrete drill-
bit. To ensure full holding power, do not ream the hole or
allow the drill to wobble. (See Fig. 5.1)
3. After drilling, remove dust thoroughly from each hole
making certain that the posts remain aligned with the chalk
line.
4. Assemble the washers and nuts on the anchors then
tap into each hole with a hammer until the washer rests
against the base plate. If shimming is required be sure that
enough threads are left exposed. (See Fig. 5.2)
NOTE:
BENDPAK LIFTS ARE SUPPLIED WITH INSTALLATION
INSTRUCTIONS AND CONCRETE FASTENERS
MEETING THE CRITERIA AS PRESCRIBED BY
THE AMERICAN NATIONAL STANDARD
"AUTOMOTIVE LIFTS - SAFETY REQUIREMENTS
FOR CONSTRUCTION, TESTING, AND VALIDATION"
ANSI/ALI ALCTV-2011. LIFT BUYERS ARE
RESPONSIBLE FOR ANY SPECIAL REGIONAL
STRUCTURAL AND/OR SEISMIC ANCHORING
REQUIREMENTS SPECIFIED BY ANY OTHER
AGENCIES AND/OR CODES SUCH AS THE UNIFORM
BUILDING CODE (UBC) AND/OR
INTERNATIONAL BUILDING CODE (IBC).
Fig 5.1
Fig 5.2
NOTE: Lift measurements shown in WIDE conguration
APPROACH
LIFT HEIGHT CLEARANCE NOTE: There must be 75” plus he height of
typical vehicle MIN distance from top of lift to nearest obstruction.
NOTE:
SUBTRACT 6-1/2” FROM MINIMUM NEAREST WALL
AND MINIMUM NEAREST BAY DIMENSION FOR
NARROW CONFIGURATION.