Instructions / Assembly

Supplement Details
Pre-built Header
1. If you purchased the optional entry door, locate where you want the opening to be and
install the 37-1/2" door header between two wall studs.
2. Secure the header by nailing through the top plate and wall studs with 10d sinkers.
3. Cut (2) two header supports from pre-cut wall studs and install under the door header.
2x4 Header Support
Install Front Roofing — Not Supplied in Kit
1. Install metal roof edging along the end walls and
the front edge of the roof sheathing.
2. Install shingles according to the instructions on the wrapper.
If you need more detailed instructions on installing shingles,
there are good publications at book stores or newsstands.
Roof Sheathing
1x6 Trim
Metal Roof Edge
2x4 Overhang