Installation Instructions

As for the wire color of DIM
+ and DIM - , pls check the
lamp label !
CAUTION:
1. Read all instructions before starting installation.
2. This product must be installed in accordance with the applicable installation
codes by a qualified electrician familiar with the construction and operation
of the product and the hazards involved.
3. Disconnect power at circuit breaker of fuse before starting installation.
4. To avoid injury, wear gloves during installation.
5. Use minimum 75°C supply wires.
Instructions:
1. Cut 4” or 6” hole in ceiling depending upon trim size. Use template on the
reverse side of this instruction to ensure fit.
2. Remove top of junction box of luminaire by removing thumbscrew and
squeezing clip. (see Fig 1)
LED Trim (4” and 6”)
INSTALLATION INSTRUCTIONS
3. Run flexible conduit (provided by others) through hole in ceiling. (see
Fig 2)
Fig 1
Fig 2
Wiring Diagram
Luminaire
Supply Line Black Wire
Supply Ground Green Wire
Supply Neutral White Wire
SAVE THESE INSTRUCTIONS
4. Remove appropriate knockout from side of luminaire junction box and
connect flexible conduit using appropriate connectors (provided by others).
(see Fig 3)
5. Make wiring connections. (see Wiring Diagram)
6. Snap top of luminaire junction box in place and secure with thumbscrew.
7. Squeeze luminaire clips upward and slide luminaire up through opening
in ceiling and release clips. The clips will spring back and secure the
luminaire to the ceiling. (see Fig 4)
Fig 3
Fig 4

Summary of content (2 pages)