Installation Guide

- 12 -
INSTALL FLUE MOUNTING
BRACKET
1. Carefully center the mounting bracket
directly over the range hood location.
2. Secure the bracket to the wall using (2)
6 x 60mm mounting lag screws (Fig.11).
Make sure the bracket is pushed into the
corner, tight against the wall if necessary,
and centered over the hood. Complete the
installation.
3. Attach ductwork to damper/duct connector.
4. Run 10” diameter metal ductwork to the
outside location (Fig.12).
5. Install an appropriate wall or roof cap with
damper to exhaust the air to the outside.
6. Tape all duct joints with aluminum duct
tape.
7. Install upper and lower decorative ues onto
the range hood (Fig.13).
8. Secure upper ue to ue mounting bracket
with (2) 3.9 x 6mm screws (Fig.14).
10”ROUND
METAL DUCT
DECORATIVE
FLUE
DUCT TAPE
CEILING
FIG. 11
FIG. 12
FIG. 13FIG. 14
MOUNTING
SCREWS
(3,9x6mm)
MOUNTING LAG
SCREWS (6x60mm)