6.5 Vibration Test
Vibration Frequency 10~55Hz
Amplitude 1.53mm
Direction 3(x.y&z)
Duration 2hrs each direction (total 6 hrs)
6.6 Drop test
Height 100cm
(to 10mm thickness woodenboard)
Direction 3(x.y&z)
6.7 Solderability Test
Soldering Temperature 230 C
Duration 3 sec
6.8 Accelerated Life Test (ALT)
Thermal Cycling :
Thermal Cycling consists of temperature ramping components for 30 minutes in the
Testing oven from -20°C to 70°C. The components are then exposed for 1 hour at
The extremes and the cycle is repeated for a total of 15 cycles..
Thermal Soak:
Thermal soak consists of exposing a powered unit to 70°C and 85% relative humidity
for 45 days.
Notice: All specifications must be satisfied in this condition.
J 09/08/31 汤浩君
I 09/05/11 汤浩君
H 09/01/17 汤浩君
BESTAR ELECTRONICS INDUSTRY CO.,LTD
Rev.
Date
6
A
B
C
D
李红元
Drawn
Note
Approved by:
Page:06 of 08
www.be-star.com wu@be-star.com
5 4
DRG NO: BS/TEY01.117J
3 2 1
Piezo Ceramic Element
Date:
Drawn by:
Checked by:
09/08/31
汤浩君
赵峥
FT-39T-2.5B1
A
B
C
D
FT-39T-2.5B1
6.1 Life test at high temperature
Temperature +85°C
Duration 240hrs
6.2 Life test at low temperature
Temperature -40°C
Duration 240hrs
6.3 Temperature cycle test
Cycles 5
6.4 Humidity cycle test
Cycles 5
All these tests above should be measured after leaving normal temperature for 2hrs.
6. Reliability test
E
F
G
H
6
+85℃
1h12h1h
10h
+20℃
15min
25℃90-95% RH
-40℃
30min
65℃ 90-95% RH
30min
+20℃
15min
E
F
G
H
博
士
達