Product Manual

14
Step 1: Install two mounting bolts (M5 or gauge 10 having at least 8mm head) onto
the mounting surface that are 12.4 in. / 31.6cm apart as shown in Fig. A.
Step 2: Turn the lock mechanism to the unlocked position Fig.B.
Step 3A: Hook the charging unit onto the mounting surface by first sliding the bottom slot
over the bottom screw.
Step 3B: Align and fasten the top hole to the top screw.
*you may have to adjust the bolts for a tight and flush fit with the
mounting surface.
Step 4: Lock the charging unit securely in place as shown in Fig. C.
TO REMOVE AND INSERT BATTERY PACK PLEASE SEE PAGE 13. FOLLOW
INSTRUCTIONS TO REMOVE AND INSERT BATTERY PACK FROM CONTROL
BOX.
FOR LEGACY SERIES
(for PERFORMANCE electronics assembly see page 11)
Attach the Control Box Hanging Bracket to the Mast and tighten the
nuts. Once the bracket is secure, then place the Legacy Electronic Box
CONTROL BOX INSTRUCTIONS/PLUG-INS
Check batteries by pressing the Battery Testing Button (blue circle with a battery
sign) on the control box.
Batteries are fully charged when all lights on the Battery Indicator are “ON”.
Charge batteries when Indicator shows only one “GREEN” light.
Do not use the lift when no “GREEN” light is shown. Charge the batteries
immediately.
Replace batteries when frequent charging is needed.