Specifications

60
Workshop manual RR 4T - 400 - 450 - 525
Insert the support pins into the crankcase holes. Fit needle
roller cage 1 and double gear 2.
Insert the preassembled kickstart shaft into the bearing hole
so that the starter coupling is located behind the release plate.
Attach the spring link to the starter spring, apply Loctite 243 to
the thread of screw 3 (M6x12), preload the starter spring by
turning it about 45 degrees clockwise, fasten the spring link
with the screw and tighten to 10 N·m.
– Position the starter spring so that the distance from the kick-
start shaft does not change.
Exercise extreme caution when fitting the spring as it could
come off and cause personal injury.
1
2
3
66_Inghilterra_059311 27-12-2007 18:32 Pagina 60