Operating Guide

12
H. Installing the ROOF PANEL
1. The side with the power supply box faces upward.
2. The edge nearest the power supply is the front of the ROOF PANEL. Be careful of the wires
coming from the SIDE and REAR PANELS when you set the ROOF PANEL down onto the panels.
Feed the wires through the holes in the ROOF PANEL. Feed the control cable and CD connectors
down from the ROOF PANEL through the long-shaped hole to the inside of the sauna (for
CD/radio hookup). (see Figure 15 and Figure 16)
3. Be careful not to force the ROOF PANEL into place. Make sure that the wires are properly fed
through the holes.
4. When all the wires are fed through their appropriate holes, lower the ROOF PANEL into place.
Figure 15 Figure 16
I. Connecting the plugs on the ROOF PANEL
1. Connect the plugs according to their respective labels. (see Figure 17 and Figure 18)
2. Connect the CTRL plug from the power supply box to the CTRL plug from the control panel.
Then screw together. (see Figure 19)
3. Connect the buzzer connection. (see Figure 20)
Figure 17 Figure 18