Instructions / Assembly

5
Beyond LED Technology | 1939 Parker Ct, Stone Mountain, GA, 30087
Due to continuous product improvement, information in this document is subject to change.
LED GRID PANELS
Installation
LED Grid Panels
Geometric Series
Warning


Shenzhen ZENITH Technology Co., Ltd.
Office:3rd floor,Building 6, Jing Hua Zhong Technology Park,No.2, Jin Long Rd, Baolong Industrial Pard,Long Gang District,Shenzhen,China.
Huizhou ZENITH Technology Co., Ltd.
Facory: 2/F Building 1,ChangFang LIGHT Industrial Psrk.No.6 DongXin Road,DONGjiang Hi-Tech Industrial Zoe,HUICHENG District,SHUIKOU Town,HUIZHOU CITY;CHINA. 516255
MOUNTING GUIDES
LED Driver
LED Chip
Aluminum sash
www.led-zenith.com
Step1 Step2
Step2-2
Step2-3
Step1-2
Step1-1
PC Cover
LED LIGHT
INSTALLATION INSTRUCTION
Warning:
Power off
Before do the installation
Step2-1
Step 1: Make sure of all the power is off before installing. Remove the one ceiling tile
that you need to install light fixture on. Then place the light fixture on the T-bar carefully
and make sure it is correctly in place and secure.
AC-N
AC-L
GREEN
LED-
LED+
DIM-
DIM+
Step 3: Open the driver’s junction box and connect the AC wire to the driver correctly (L=black & N=white)
Step 2: Place the driver on top of the next ceiling tile. Connect the cable between the driver and the lighting fixture.
CCT adjustment
Power regulation
Warning:
Make sure all the power is off before installation.
All the installations are required to be done by professionals.


Shenzhen ZENITH Technology Co., Ltd.
Office:3rd floor,Building 6, Jing Hua Zhong Technology Park,No.2, Jin Long Rd, Baolong Industrial Pard,Long Gang District,Shenzhen,China.
Huizhou ZENITH Technology Co., Ltd.
Facory: 2/F Building 1,ChangFang LIGHT Industrial Psrk.No.6 DongXin Road,DONGjiang Hi-Tech Industrial Zoe,HUICHENG District,SHUIKOU Town,HUIZHOU CITY;CHINA. 516255
MOUNTING GUIDES
LED Driver
LED Chip
Aluminum sash
www.led-zenith.com
Step1 Step2
Step2-2
Step2-3
Step1-2
Step1-1
PC Cover
LED LIGHT
INSTALLATION INSTRUCTION
Warning:
Power off
Before do the installation
Step2-1
Step 1: Make sure of all the power is off before installing. Remove the one ceiling tile
that you need to install light fixture on. Then place the light fixture on the T-bar carefully
and make sure it is correctly in place and secure.
AC-N
AC-L
GREEN
LED-
LED+
DIM-
DIM+
Step 3: Open the driver’s junction box and connect the AC wire to the driver correctly (L=black & N=white)
Step 2: Place the driver on top of the next ceiling tile. Connect the cable between the driver and the lighting fixture.
CCT adjustment
Power regulation
Warning:
Make sure all the power is off before installation.
All the installations are required to be done by professionals.


Shenzhen ZENITH Technology Co., Ltd.
Office:3rd floor,Building 6, Jing Hua Zhong Technology Park,No.2, Jin Long Rd, Baolong Industrial Pard,Long Gang District,Shenzhen,China.
Huizhou ZENITH Technology Co., Ltd.
Facory: 2/F Building 1,ChangFang LIGHT Industrial Psrk.No.6 DongXin Road,DONGjiang Hi-Tech Industrial Zoe,HUICHENG District,SHUIKOU Town,HUIZHOU CITY;CHINA. 516255
MOUNTING GUIDES
LED Driver
LED Chip
Aluminum sash
www.led-zenith.com
Step1 Step2
Step2-2
Step2-3
Step1-2
Step1-1
PC Cover
LED LIGHT
INSTALLATION INSTRUCTION
Warning:
Power off
Before do the installation
Step2-1
Step 1: Make sure of all the power is off before installing. Remove the one ceiling tile
that you need to install light fixture on. Then place the light fixture on the T-bar carefully
and make sure it is correctly in place and secure.
AC-N
AC-L
GREEN
LED-
LED+
DIM-
DIM+
Step 3: Open the driver’s junction box and connect the AC wire to the driver correctly (L=black & N=white)
Step 2: Place the driver on top of the next ceiling tile. Connect the cable between the driver and the lighting fixture.
CCT adjustment
Power regulation
Warning:
Make sure all the power is off before installation.
All the installations are required to be done by professionals.