User Manual

6
ASSEMBLY
All numbers in parenthesis () refer to the index
number from the parts breakdown.
1. Mount the four sliding plate assembly (16) to the
saddle, using eight bolt (21) and eight washers
(22).
2. Thread buttery nut (17) part way up the chain
hook (18) , and buttery nut (17).
SYSTEM AIR PURGE PROCEDURE
IMPORTANT: BEFORE FIRST USE
Perform the following Air Purge Procedure to
remove any air that may have been introduced into
the hydraulic system as a result of product shipment
and handing. This step is to be completed without
any weight on the jack.
3. Screw the pump handle (5) into the socket.
4. Tighten release valve assembly (7) clockwise
to close the pump release valve. Pump handle
up and down to lift the whole stroke. Release
release valve assembly (7) for lowering. Test
jack raising and lowering operation several times
before use.
16
22
21
17
17
18
17
5
5
7
1. Turn release valve counterclockwise one full turn
to the open position.
2. Quickly pump the jack about 10 to 20 times.